Using Sharepoint 2010 Lists and syncing with MS Project 2013

$
0
0

I have an MS Project which I have synced with a task list in Sharepoint 2010.  Some of the columns when data is entered from the sharepoint are not updating in the MS Project when they are synced.  Why would this be?

When the list is created from Project in Sharepoint the entered data is correct with project but once updated on sharepoint and then project is synced the data does not update in project.